The final phase, phase 3. Erik and I spent the better half of the summer tearing the 2nd floor apart and putting it back together. We found; the insulation that was blown in had trails from rodents, the old mineral wool is very itchy when it gets on your skin, there was a good deal of recycled wood holding the 2nd floor together, the front dormers were floating (there was nothing tying it back to rest of the house), a Ted Williams baseball card, all the razerblades from a lifetime of one man's daily shaving ritual fell behind the medicine cabinet into the wall, there was a 3" difference across the 2nd floor, the dump guys can be bribed to fit 4 trailer loads in only 2 and that we like outdoor showering even into October. Here are some photos highlighting the gutting process.