Carter made an appearance, enjoying some G& Ts on the loveliest days we'd had in a week.
Tool Belts
Thursday, May 26, 2011
Framed
Foundation
Well, soon after the guys were finished excavating the hole for the addition... (Oh, did I mention we are adding a mudroom entry between the original house and the kitchen. This will house a mudroom, entry, a coat closet, a powder room, and a little linen closet. ) the guys ran off (they had to catch a ferry to their next job!), leaving a giant hole. Fred Prescott, the foundation guy, came in and built the forms for the footings.
And his son took it from here, this was to be his last foundation he poured with his dad before he was moving to Massachusetts to go to college.
Footings being poured.
Moving the wet concrete around doesn't look easy.
He smooths it out with a trowel.
The next day, in between torrential rain, they put up the wall forms.
Bartlett is thrilled to have a new dirty place to lay.
Wednesday, May 18, 2011
Septic 101- part 2
Part 2; Septic install.
Then he buries it with another foot of sand.
Monday, May 16, 2011
Septic 101
It's here! Our septic is being installed, today. It was a bit of a surprise this morning when the trucks showed up. I wasn't expecting them. But there they were at 7am. It'll be a mess out front, for a bit but we'll finally have a septic and we won't be wondering how much longer we could go without it.






Oops, the tank is in the right spot, but needs to be 4" further down and then we won't need a pump. They pull it up and dig a bit more out and set it in the hole again.

These loops are what the liquid waste is run through- or the leaching field.
Looking for the existing cesspool. Surprise! There isn't one or at least there isn't one any longer. It may have collapsed. At least the pond will finally have a chance to clean up.
Close call with the crane and the electrical wires, this guy wasn't even sweating.
The concrete blocks are the bottom and top of the tank.
Lifting into the hole. Just made it under the wire, literally.
Lid on- over a water stop sealant. They are ready to lay the leaching field out. Waiting for a layer of sand, silt, dust to be unloaded in order to lay the leaching bed out.
Tuesday, April 26, 2011
Kitchen- Before & After
The photo above is of the large fireplace during our walk through. This great room was a surprise to us, it is not apparent from the exterior of the house, that this room existed. It did have some issues, some of you may remember the tree removal. That helped immensely. Now we have a slider with a transom over the top that brings in so much light during the day and gives us a great view of the pond out back. Removing the 8'-0" hearth has helped in being able to furnish the entire space. Of course relocating the kitchen into the room- affords us a place for us both to be- while Erik whips us up a gourmet meal I can sit on the couch and watch,American Loggers. Or did I get that reversed. It is, NOW, truly a family room.
This was taken during our gut of the space- where the ladder is leaning up against the wall was what was meant to be ( I think) a powder room- but was never realized. It just became another dark hall way with a large closet. We tore it out- opening it up to the existing house- with the intention of building a mudroom entry at a later date that would open up to the new open space. The door in the background opens up into the garage- for some time our dumpster (s) were in there and that is where a new smaller mudroom, giving a buffer from the garage, instead of just opening up into the great room.
AFTER
We kept the wood box- put new pine paneling inside. We drywalled the entire room- leaving the existing beams and natural posts.
New slider with transom above and replaced the door to the deck with a window. Much brighter.
Sliding barn door, Erik made the door from salvaged barn board and it is on wood rails that run on a metal track. This closes off the mudroom into the garage- if we want another layer from the garage in the winter. It is reminiscent of our trip to Austria- where they utilized many old materials. It helps tie in the old beams to the space as well. The mudroom has changed color since this photo was taken- stay tuned...
Ta DA!! Kitchen revealed, new window over the sink. Island. Pendants. There are a few things in here that need tweaking, but we are officially using the refrigerator, sink, dishwasher and stove. Erik added barn board to the underside of the Island, which really makes this a one of a kind piece.
It's a bit Shaker and a bit Scandinavian. We tried to stay with the classic lines with the cabinets, keeping the old details of the beams, while we edged it up with some modern fixtures. Of course, this post comes after about 15 different paint colors. We finally agreed on Farrow & Ball's, old white. It is a subtle color that is bright during the day and gives a warm cozy feeling at night.
We are planning on adding some more barn board to mimic the beam above the fireplace wall over the sink- but we ran out, so if you know any sources, do let me know. Preferably free. I don't mind dressing in black at night to get it either, if you know what I mean.
Hearth Repair- Before & After

March 11, 2010 (Before)
Last year about this time, we were ripping up the Hearth that extended into the room 8'-0". It was awkward. Kevin & Erik went ballistic on the brick work- tearing even into the inside of the fireplace. When we brought the wood flooring over the concrete slab- we had to lay thin sleepers over it, in order to maintain an even height over the slab. Well, the same was true when Erik went to lay the bricks back into the fireplace & hearth. Still wanting to maintain the elevation of the Heart Wood floor- we wanted the hearth to be flush to it. This meant that each brick had to be cut to realize the floor height. It was a chore- since the slab was poured rather uneven- each brick was a different height. Some turned out to be a 1/2" thick after being cut down. Not only was this a feat of skill, it was a race against time, with the rental of the brick saw only giving us a small window for all the cutting to take place, 5:30pm on Friday night until 5pm on Saturday. Not quite 24 hours.
The Hearth with the bricks laid out in a pattern- precutting. A bit of history- the bricks were originally salvaged from a building that was torn down at Portland Head Light. The story goes that the Capano kids (previous owners) cleaned the mortar off each brick. Let's see if they confirm that story.
Head to Toe covered in brick dust.
The finished result, Bartlett is enjoying the new flush hearth. She has turned into a dog that loves to sleep in front of the fireplace. Who knew?
Saturday, March 5, 2011
Everything & the Kitchen Sink
boxes
Cannot picture what this is- it's a wall of cabinet boxes.
and more boxes.
That is the path through the dining room. It is about a foot wide. Wall to ceiling boxes of cabinets. Oh, and Yes that is a brick patterned linoleum flooring. It's throughout the entire original section of the house. I know, we are so lucky!
Subscribe to:
Posts (Atom)