Erik and I ended our 2011 with a walk at Crescent Beach with Bartlett. When Erik and I first got Bartlett, almost 9 years ago, we would drive from Portland where Erik lived on May Street to bring her for a walk on the beach. Serendipitous, now this walk is literally down the street from our house. Amazing that we have been together for almost 10 years now. I just teared up. And only married for almost 3... where does the time go? It's moments like today and the ones when we would bring Bartlett to "the beach with the purple sand", that I remember fondly. I guess I don't remember most of the mundane and the trouble, which is why this blog is helpful. I can look back and see all the work we did in the past 2 years

That's Bartlett in the water, after this shot she lost her beloved ball and cried. Literally, she cried for it. She also body surfed a wave in, according to Erik it was amazing. We all were sad about the ball, mostly because she cried.

Last days of 2011, have seen some progress in the mudroom. This fall the sheetrock went up easy when Brian King came to visit. And then it was duck season. Friday night, Erik put up the first coats of mud over the seams and screws. Today, in 5 hours Erik finished the first round. All the tape is on, and in some places 2 coats were applied. Maybe we'll be ready to lay flooring ?
While Erik was putting mud up, I lugged from the basement all the wood on an 8ft rack for our fireplace.



In the New Year, I look forward to finishing phase 2 of the house renovation. When asked what I wanted most for Christmas, I said "for the house to be done". I am getting tired of everything coated in dust, vacuuming 3x a week, living in one room (although it is spectacular), I would like to unpack ( I just found a bin with jackets & hats I was looking for last year), getting back to things we love to do, skiing, biking, hiking, I am anxious to get the upstairs done so we can have our life back. Things I am looking forward to the most; having people over, having a christmas tree, having a place for friends & family to stay over, and being able to do something else other than fill trashbags with dirty insulation, 2 years is a long time to be living like this, and we are looking at another year at least to finish the upstairs.

What we accomplished this year, has been amazing; we finished the great room & kitchen, we gutted the downstairs of the existing portion of the house, we built a mudroom addition, we replaced all the windows on the first floor and 1 window upstairs, we sided and put a roof on the addition, shored up the Sh-arn for another year, and got new electric and insulation in the addition and the existing portion of the house. Erik rebuilt a tractor. And in that year I passed 2 of my architectural registration exams. I know, it's exhausting!

Well, we look forward to 2012 and Hope you all have a Happy, Healthy, Prosperous New Year!



Monday, November 28, 2011

Fall Wrap-up-Part 3.2

From this view it almost looks finished. *sigh* The new mudroom/entry. Which now has radiant heat in the floors, insulation, lights, and drywall up. Still needs flooring, doors, and to be mudded, sanded, mudded....
View from the kitchen- to the mudroom and entry. Bartlett doesn't love the open stairs. She would not like to see through, it makes her nervous.

We desperately need to put down a walkway, we track sand inside and it isn't good for our floors. Erik made a temporary gang plank, so only 1/2 the dirt comes inside now.


Sunday, November 13, 2011

Fall Wrap-up-Part 3

That's the inside of the foam truck. Yah. I guess, we were lucky, it wasn't too cold this Fall. Although, the last weekend of October was bitter cold with that freak snow storm. It was awefully cold actually, since the electricians were here that Saturday wrapping up the job, the power was shut off for most of the day, and I was trying to study.Luckily, we didn't get too much snow either, since most people were without power on Sunday and Monday and we had it. Brand new wiring in fact. Finally, on Wednesday we got insulation.


Since the older 1/2 of the house, has nominal 2 x 4 construction we had a closed cell foam sprayed in there. Which gives us an R-21 at the wall. The closed cell also is a bit more rigid and stiffens the walls up a bit. Which also helps. The new construction, roof and 2nd floor got the open cell foam, since it expands more, this fills the entire 2 x 6 cavity and doesn't allow air & moisture to convect or condense in the wall. We are already seeing a difference with the boiler in the older section of the house, not continuously running all day either. Already, we are feeling like the house is more efficient.

Fall Wrap-up-Part 2

So after 2nd floor was reframed, we needed strapping on the ceiling- to accept the drywall, which in an old house all needs to be shimmed- cause this house hasn't been square...uh.... ever! So that took a while. New walls in the mudroom for a closet and powder room were framed. Pocket door for the powder room, which was tricky, needs special framing. But not a big deal, cause you just get a kit at the hardware store. New walls for the laundry room and Oh, I nearly forgot, new windows on the front of the house. Not to mention, Erik had planned on a hunting trip to the NEK with cousin Bob and his friends. A ton to do and not a lot of time to do it.
Bird Camp
After work & the weekends that were available, Erik managed to do it all. New framing, new windows, and the electricians were able to come in the last week in October and pull out all the old wiring, which was called "2 tube" newer than Knob & tube, but encased in a fabric sleeve that screamed "fire" everytime you turned on the switch. It also made a very loud noise, which I was always wondering if that was a spark and if I just turned the house on fire? It was very unsettling, to say the least. Now, all the basement lights come on when you hit one switch, instead of the one light that was on, when you turned off all the other lights. Bowdler Electric also ran wiring for the 2nd floor, so when we get to Phase 3, we'll be wired in and ready!

New wall at mudroom & wiring for outside lights and mudroom overheads.
New framing & wiring, strapping beyond.

Fall Wrap-up-Part 1

It's been a busy few weeks here at 528. In order to get ready for insulation, we needed to re-wire the electric, which needed to have all the walls ready, which meant we had to re-frame and build new walls. Brian King came up one weekend to help Erik reframe the living room. It was a little sponge-y when you walked up stairs in the bigger bedroom, turns out the 2nd floor joists ran the lenght of the existing part of the house. That's why it felt like walking on a trampolene. Erik & Brian ran new LVLs in the 2nd floor framing and cutback and hung the existing framing off of the LVLs to stiffen up the framing. It was a ton of running into the basement, jacking up from below, building walls to hold up some of the framing, cutting back the joists, running down into the basement, jacking up below, then moving the LVL into place, tiring just trying to remember everything that was done.
Brian contemplating where the post can be located.
Brian & Erik framing in a new header between the Living & Dining rooms.
Looking down to where the posts are going.
This was a HUGE push, and we couldn't have gotten ready for the electrical portion of Phase 2 without Brian. Thank you for spending your weekend with us. It is greatly appreciated.

Thursday, September 15, 2011

Going Postal

Evidently our mailbox wasn't up to the US postal service standards. The postwoman left us a diagram showing us that the mailbox wasn't at the proper height (45") and the box was not secured to the base. The repairs to the mailbox clearly was not a priority for us, but the alternative of not getting our mail was a swift kick to get this done.

Here is the new mailbox, Erik re-used the post for our light at the end of the driveway, and some leftover decking from the back deck.

Peggy the Postwoman was very pleased with the new mailbox, she even pulled into the driveway one morning to find out what colors we have used for the siding & trim. She loves the progress on the house so much, I think she just wanted to see what we would do with the mailbox.

Tuesday, August 23, 2011

Stink Fest


As you can see by Erik's mask, this weekend stunk. We got the majority of the stink out of the way on Saturday by demolishing the remaining walls in the living room. While Erik was going "ape shit" crazy tearing the room apart, I was bagging up squirrel shit ridden insulation, bringing 6 loads of various shit loaded wall board to the dump. On my 2nd trip to the dump as I was backed up to the hopper for what was supposed to be a quick unload, as I went to pull forward....I couldn't get the volvo to shift into drive.

(As many of you know, we have a truck. What you may not realize is that most of the time I don't get charged for dumping materials at the dump, because typically there is no charge for car loads, truck loads are another story- for instance, 10$ a load for wood waste)
The car was stuck, it was running and I couldn't move the gear into drive. I was starting to panic. As it was Saturday morning at the Cape dump and I could see by the look on the guy's face in the truck staring at me, that I had taken too long already in prime dump real estate. I turned the car off, swore, and turned the key hoping my nightmare would move into gear. Luckily, that tricked the volvo and I hauled ass home- Bartlett slid off the seat as we peeled out of the access road. She gave me the stink eye, wondering why all the rush. I tried to explain that if the volvo died for good at the dump, we'd certainly be the talk of the town. We came into the driveway sideways, where I tried to get it into park and yet again, it wouldn't budge. Long story short- the volvo was all sorts of messed up and 1 hr and a half later, I had it towed for it's later fate. The truck took the final 4 dump trips. Those last 4 loads cost me $20. The volvo would cost me much more when I got the bill from John's Mechanical Service, for the burned out relay & gear selector.
Bill Lee stopped by just as things were starting to get going and took some action photos of the living room and the tow truck carting the volvo off to the shop.
I am thinking at this point, I just dropped the transmission and that I might have to dust off the bike for awhile.
Erik has a glimmer of "hope" still in his eyes. After seeing what was inside the walls or better yet the lack of structure in the room, the car isn't a big deal.